• Contact
  • Locations
  • German
  • Select your local site
Hompage
  • Dürr Global Website
  • Company
  • Investor Relations
  • Press
  • Product Overview
  • Purchasing
  • Services & Solutions
  • Career
News
You are in: 
  • Company  >
  • Divisions
  • Overview
  • Divisions
    • Paint and Assembly Systems
      • Paint and Final Assembly Systems
      • Application Technology
      • Environmental and Energy Systems
      • Aircraft and Technology Systems
    • Measuring and Process Systems
      • Balancing and Assembly Products
      • Cleaning and Filtration Systems
      • Schenck Technology and Industry Park
  • Strategy
  • Board of Management
  • Supervisory Board
  • Locations
  • References
  • Innovations
  • Environment
  • Tradition
  • Trade shows
  • Campus

Dürr News

Would you like us to send you the latest product news regularly by e-mail? If so, please fill in the

Subscription

The December 2009 issue
Proven technology at low cost: Dürr Ecoclean presents a new entry-level model for solvent cleaning
EcoEMOS Energy Monitoring – Transparency as a foundation for optimization
Re-positioned - Successful optimization with Dürr Consulting
Mobile test cyclone – Optimize separation of your solids and liquids
1st e-coated body - Paint shop goes into operation at Mahindra
Windpower plants – Siemens develops a global reference standard for the assembly of wind turbine nacelles together with Dürr Consulting
Aircraft assembly – Dürr and EDAG realize a final assembly line together with Airbus at Tianjin, China
Offical unbalance: Schenck test laboratory receives accreditation
In brief
Upcoming events

Archiv

Feature topic

Download newsletter 12/2009 (PDF 0,7 MB)

  • Legal information
  • Credits
  • Sitemap
  • Glossary
  • Print