Trade Press 2007

Date Title
11/27/2007 Airbus uses Dürr technology for vertical tail plane assembly

Stuttgart, November 27, 2007 – Airbus manufactures vertical tail planes for all of its aircraft families at its Stade site in Germany. Dürr Aircraft Assembly Systems (AAS) received the contract to...

[more]
10/09/2007 Dürr Ecoclean presents the first hydrocarbon system for inline, individual part cleaning in manufacturing cycles
World first: EcoCSpeed cleaning system

Filderstadt, 9th October 2007 – Dürr Ecoclean GmbH’s EcoCSpeed offers new advantages for inline cleaning of individual parts. This innovative system makes it possible for the first time to clean...

[more]
09/21/2007 Focus on costs per unit: Dürr presents paint-saving innovations
Sixth Open House in Bietigheim-Bissingen Painting Technology Center
  • EcoBell 2 atomizer technology cuts materials consumption
  • New family of Dürr robots for interior painting extended
  • Product initiative in sealing technology
  • Expanded use of 3D visualization
[more]
09/07/2007 For the best moments –New moment scale for turbine blades

Fluid dynamic engines such as steam and gas turbines and jet engines, the blades make up a substantial proportion of the rotor mass, and therefore significantly affect the unbalance. Outwardly...

[more]
08/02/2007 Dürr FAS x-cal certification authorized by Accreditation Body

Püttlingen, August 2, 2007 – Regular calibration is required for measuring equipment of all kinds. This also applies, of course, to the roller test beds used in the automotive industry. To meet this...

[more]
08/02/2007 VIRIO – the milestone in balancing

VIRIO represents the latest generation of vertical balancing machines from Schenck. Equipped with the very latest technology, an ergonomic overall concept and flexible modular construction, this is...

[more]
08/01/2007 EcoCGrip – the flexible robotic gripper from Dürr Ecoclean for the toughest cleaning conditions

Monschau, August 2007 – An increasing proliferation of options and ever shorter product life cycles are changing production processes in the automotive industry: A high degree of flexibility is...

[more]
07/12/2007 Production fit for the future – support for Airbus from Dürr and Stohrer

Stuttgart, July 12, 2007 – In 2008 new legislation comes into effect relating to accidents involving hazardous materials. In order to ensure proper compliance Airbus, assisted by Dürr and Stohrer, is...

[more]
07/10/2007 Reduce your RTO (Regenerative Thermal Oxidizer) Fuel Consumption by as Much as 60%

Up grading your RTO system with the latest energy enhancement features can provide a simple pay back of less than one (1) year. As most panel board plant manager have already realized, the cost of...

[more]
07/10/2007 For the first time, interior painting of vans and trucks with the ESTA process

Bietigheim-Bissingen, July 10, 2007 – For the inside painting of trunk compartments at vans and trucks as well, highest quality control requirements are valid. At passenger cars, a relatively small...

[more]
07/05/2007 Final assembly system on tour

Stuttgart, July 5 2007 – They were first installed in the spring of 2004 – in a building used for R&D trials situated close to the DaimlerChrysler factory at Sindelfingen. “They” were FAStplant®...

[more]
06/05/2007 Dürr successful in Eastern Europe growth market

Stuttgart, June 5, 2007 – The Dürr Group is benefiting from auto industry growth in Eastern Europe. The mechanical and plant engineering firm received two large orders from that region in recent...

[more]
05/24/2007 6th Dürr Open House in September
Innovations for more Efficiency, Quality and Environmental Compatibility in the Painting Process

Stuttgart, May 24, 2007 - On their 6th "Open House" from September 21, Dürr Systems GmbH will introduce innovative technologies for the painting of bodies and epoxy add-on pieces. The presentation of...

[more]
05/15/2007 Dürr Ecoclean reports high demand for its EcoLution product line

Monschau, 15 May 2007 – Just four weeks after the introduction of the new EcoLution product line, Dürr Ecoclean GmbH has already sold eleven EcoLution systems. This rapid success demonstrates that...

[more]
04/12/2007 FAStplant® in India – Production at BMW with innovative assembly system from Dürr FAS

Stuttgart, April 12, 2007 – BMW has opted for FAStplant® the modular final assembly concept from Dürr Factory Assembly Systems (FAS) for its new production facility at Chennai. Assembly of BMW 3...

[more]
03/20/2007 Dürr FAS to supply a new test line for Ferrari

Püttlingen, March 20, 2007 – Dürr Factory Assembly Systems (FAS) is to supply a new test line for all models produced by Ferrari at Maranello, Italy. As from May of this year Dürr technology will...

[more]
03/06/2007 RoDip4: Lower unit costs and increased versatility in pretreatment and electro-dip paint plant layouts

Stuttgart, March 6, 2007 – Dürr has carried out further development on its successful RoDip rotational painting system. In addition to features such as a drive system on one side only, the new...

[more]
03/01/2007 EcoLution - outstanding flexibility and performance

Monschau, 1 March 2007 – With today’s launch of the new EcoLution product line, consisting of the EcoCTrans and EcoCFlex systems, Dürr Ecoclean GmbH has set another milestone in cleaning technology....

[more]
02/12/2007 New Dürr FAS marriage station for Volvo Cars

Püttlingen, February 12, 2007 – Dürr Factory Assembly Systems (FAS) is supplying a new marriage station to Volvo Cars at Ghent. The installation can only be carried out during the works vacation...

[more]
01/26/2007 Dürr Systems Inc. selected as "Energy Partner of the Year

Stuttgart, January 26, 2007 – Dürr Systems, Inc. and BMW Manufacturing Co. LLC were joint recipients of the "Energy Partner of the Year" award presented by the United States Environmental Protection...

[more]
01/26/2007 Dürr FAS receives new final assembly order from Russia

Stuttgart, January 25, 2007 – Dürr Factory Assembly Systems (FAS) is becoming more and more established as an equipment provider to the Russian final assembly market. This was most recently...

[more]
01/12/2007 Dürr reinvents wheel geometry measurement

x-3Dprofile – dynamic Pattern Projection

Püttlingen, January 12, 2007 – Wheel geometry measurement carried out during the assembly process has a major influence on the later road driving behavior of...

[more]