Press

Trade Press 2009

Date Title
11/30/2009 Like it shorter? Shortest painting lines through integrated application concept and one hundred percent full automation

A complete painting line, almost 30% shorter than usual, with fully automatic paint application, highly flexible and with a capacity of more than 50 units per hour? A dream? No, it is reality. Such a...Read more

11/03/2009 Dürr receives award from Hyundai

Bietigheim-Bissingen, 3. November 2009 – September 24th of this year was a great day for Hyundai: The Czech plant in Nosovice outside Ostrava officially opened with a festive ceremony. In the course...Read more

10/22/2009 Proven technology at low cost: Dürr Ecoclean presents a new entry-level model for solvent cleaning

Filderstadt Germany, 22 October 2009 - "Focusing on the essentials" – under this motto Dürr Ecoclean introduced the "EcoCBase C2” compact cleaning system for the trade fair, parts2clean. The...Read more

10/07/2009 Crystal clear visualization – EMOS.Web for water treatment

Bietigheim-Bissingen, Germany, October 7th, 2009 – It was the simplicity of using Dürr's EMOS.Web software that proved so convincing to Eurowater, a leading manufacturer of water treatment systems....Read more

10/01/2009 The official unbalance

From now on there is a first address for the qualification of balancing systems and associated working standards: As the only organisation in the world of its type, the test laboratory of Schenck...Read more

09/23/2009 Siemens develops a global reference standard for the assembly of nacelles for wind turbines together with Dürr Consulting

Stuttgart, September 23, 2009 – A single global reference layout for new assembly lines for wind turbines: this vision projected by Siemens’ Wind Power Business Unit has been realized by planning...Read more

08/24/2009 parts2clean 2009: EcoCO2 cleans complex parts efficiently and dries surfaces without residue

Filderstadt, August 24th, 2009 – Dürr Ecoclean is treading new paths in fine and ultra-fine cleaning technology. With its EcoCO2 cleaning system, the company launches the first-ever process solution...Read more

08/11/2009 FAStplant® pilot line for Volkswagen in Zwickau

Bietigheim–Bissingen, Germany, August 11th, 2009 – Daimler, Ford and Toyota already have it, and Volkswagen is obtaining it for its factory in Zwickau: the pilot line of the modular FAStplant® final...Read more

07/15/2009 Dürr and EDAG realize complete final assembly line with Airbus in Tianjin

Stuttgart, July 15, 2009 – In building new production capacities, the aircraft industry is relying more heavily on key suppliers that can realize large turn-key work packages. The new Airbus plant in...Read more

07/06/2009 Dürr to deliver top coat line with dry separation to Chattanooga

Stuttgart, July 6, 2009 – Up to 150,000 vehicles a year will roll off the production line at Volkswagen AG’s new plant at Chattanooga in the US Federal State of Tennessee from 2011. EcoDryScrubber,...Read more

07/02/2009 EcoSupply P - Special Paint Supply with New, Simple Pig Modules Successfully Introduced

Bietigheim-Bissingen, July 02, 2009 – With new, smaller pig modules that are integrated in the color changer, two EcoSupply P systems supply four robots and two EcoMACC control stations at MAGNA...Read more

06/25/2009 Two awards for EcoDryScrubber

Stuttgart, June 25, 2009 – Energy savings of up to 60% in spray booths and up to 30% in complete paint shops combined with reductions in CO2 and paint particle emissions – these were the facts that...Read more

05/14/2009 Innovative EcoLCC color changer by Dürr in production use at VW Sachsen

Bietigheim-Bissingen, 14 May 2009 - The EcoLCC color changer reduces paint losses from more than 40 ml to 8 ml per color change and shortens the color change time to less than 10 seconds. The robots...Read more

05/04/2009 Dürr and Schenck to exhibit at Mashex Moscow

Stuttgart, May 4 2009 – Dürr, the plant and machinery group, will be exhibiting at the Mashex machine building industry trade fair to be held at Moscow. On a joint stand for the well-known and long...Read more

04/06/2009 Time is Money: Efficiently Increase Process Safety in Next to no Time

Paint automation system suppliers have to face special challenges to an increasing extent. The time period allocated for demolition, revamping and modernizing of equipment, the bread and butter for...Read more

04/01/2009 State-of-the-Art Control Engineering - Simpler, Faster and more Effective

The computer technology changed our life at a fast speed. Particularly the production technology is not imaginable anymore without its use. In this connection, science speaks of the third industrial...Read more

03/17/2009 Dürr partners with Volkswagen at the Hanover Fair

Stuttgart, March 17, 2009 – “Innovations for more sustainability in products and production,” is the motto showcased by Volkswagen AG, from April 20th-24th in Hall 16 at the Hanover Fair. Dürr, as an...Read more

02/06/2009 FAStplant® on four continents – New order for Volkswagen South Africa

Stuttgart, February 6, 2009 – In February 2009 the eleventh FAStplant® installation will go into operation at VW’s factory at Uitenhage in South Africa. The plant continues the success story of this...Read more

Dürr News